[1]
Albar, S., Windarta, J., Wardaya, A.Y. and Elshaarani, T. 2022. Integrating PV plant 689 kWp into Coal-Fired Power Plant (CFPP) 615 MW at Paiton: To reduce auxiliary load and coal consumption. Teknomekanik. 5, 2 (Dec. 2022), 103–111. DOI:https://doi.org/10.24036/teknomekanik.v5i2.17072.