(1)
Albar, S.; Windarta, J.; Wardaya, A. Y.; Elshaarani, T. Integrating PV Plant 689 KWp into Coal-Fired Power Plant (CFPP) 615 MW at Paiton: To Reduce Auxiliary Load and Coal Consumption. Teknomekanik 2022, 5, 103-111.