Albar, Syarief, Jaka Windarta, Asep Yoyo Wardaya, and Tarig Elshaarani. 2022. “Integrating PV Plant 689 KWp into Coal-Fired Power Plant (CFPP) 615 MW at Paiton: To Reduce Auxiliary Load and Coal Consumption”. Teknomekanik 5 (2):103-11. https://doi.org/10.24036/teknomekanik.v5i2.17072.